Installation guide for

Apres Body Dryer

Medium
45 minutes

Installation Steps

Follow these steps to install the iDry body dryer.

1

Step 1

Always choose a position, preferably a corner, that faces the user.

2

Step 2

The leg needs to be as close as possible to the potential drying position of the user and water outlet.

3

Earthing

This unit must be earthed

4

Step 4

Measure exactly 198cms from the top of the shower tray or wet floor to the centre hole of the mounting bracket, and 13.5cm from the corner to the centre of the hole, and mark.

5

Step 5

The Dryer Head Unit has two pairs of holes to facilitate fixing to either wall of the corner. Blank the redundant holes with the white plugs (supplied).

6

Step 6

Fit the flexible tube of the bellows supplied to the nipple situated at the rear of the underside of the Dryer Head Unit.

7

Step 7

Hang the Dryer Head Unit from the mounting bracket ensuring that the two lugs on the bracket are firmly located into the two holes on the Dryer Head Unit.

8

Step 8

Insert the two parts of the leg together. Then place the foot plate in the bottom of the assembled legs. Hold the leg assembly, carefully insert the top of the leg assembly into the Dryer Head Unit and sit the foot plate on the lip of the shower tray or wet floor and line in a central position.

Need Additional Help?

Our support team is here to help if you encounter any issues during installation.

Secure

© 2025 Supertune Ltd T/A iDry. All rights reserved.

Powered byRODA Technology Ltd